Installing a septic system is a crucial step for homeowners who are not connected to a municipal sewer system. It is essential to follow the proper installation process to ensure the system functions effectively. In this guide, we will provide you with step-by-step instructions, tips, and requirements for installing a septic system.

Key Takeaways:

  • Learn how to install a septic system in your home
  • Follow the septic system installation guide for a successful installation
  • Understand the septic system installation process and its requirements
  • Discover the necessary steps and tips for installing a septic system
  • Ensure compliance with septic system installation regulations

Step One – The On-site Evaluation

The first step in installing a septic system is to conduct an on-site evaluation. This crucial step ensures that the system is installed correctly and meets all necessary requirements. One of the key components of the on-site evaluation is a soil investigation, which is typically carried out by a qualified soil scientist.

The soil scientist will assess various soil properties, including texture, structure, and the water table level. These factors play a significant role in determining the minimum requirements for the septic system installation. By conducting this evaluation, homeowners can ensure that their septic system functions effectively and complies with both local and state septic regulations.

The Importance of Soil Investigation

A soil investigation is a vital part of the on-site evaluation process. This investigation helps determine the suitability of the soil for the septic system installation and identifies any potential challenges that need to be addressed. Key factors assessed during the soil investigation include:

  • Soil Texture: The soil’s texture affects how well it can absorb and treat wastewater. Different soil textures have varying levels of permeability, which can impact the design and sizing of the septic system components.
  • Soil Structure: The soil’s structure refers to how particles bind together to form aggregates. A well-structured soil promotes good drainage and infiltration, allowing the septic system to function optimally.
  • Water Table Level: The water table is the level at which the soil is saturated with groundwater. A high water table can affect the system’s ability to treat wastewater, as it may interfere with proper drainage and lead to costly maintenance issues.

Based on the findings of the soil investigation, the soil scientist will recommend the appropriate septic system design and installation techniques. This ensures that the septic system is specifically tailored to the unique characteristics of the property’s soil composition.

Meeting Septic Regulations

Complying with septic regulations is crucial for the successful installation of a septic system. Local and state governments have specific guidelines and requirements regarding septic systems to safeguard public health and the environment. These regulations address factors such as setbacks, system sizing, component specifications, and installation procedures.

By conducting an on-site evaluation and a soil investigation, homeowners can ensure that their septic system installation aligns with the necessary regulations. This proactive approach helps prevent complications, potential violations, and the need for costly system modifications in the future.

Benefits of On-site Evaluation
1. Ensures appropriate septic system design for the property’s soil composition.
2. Helps identify potential challenges and address them during the installation process.
3. Promotes compliance with local and state septic regulations.

Step Two – System Requirements

After the on-site evaluation, the county health department issues the system requirements for the septic system installation. These requirements are based on the soil investigation report. The system requirements include the following information:

  • Type of System: The specific type of septic system that is suitable for your property, considering factors such as soil composition and water table level.
  • System Size: The size of the septic system, which is determined based on factors like the number of bedrooms in the house and the estimated wastewater flow.
  • Trench Depth: The required depth at which the trenches should be dug to ensure proper wastewater treatment and disposal.
  • Perimeter Drain Requirements: The specifications for the perimeter drain, including its size, placement, and distance from the septic system components.
  • Septic Tank Size: The minimum size of the septic tank that meets the capacity requirements for your property.
  • Dosing Tank Size: If applicable, the size of the dosing tank, which is required for specific types of septic systems.

It is crucial to consult with the county health department to ensure compliance with their specific requirements. Their expertise will help you determine the minimum requirements for your septic system installation, ensuring its proper functionality and longevity.

Step Three – Design

Once the on-site evaluation is complete and the system requirements are determined, the next crucial step in the septic system installation process is designing the system. A comprehensive and well-thought-out design is essential to ensure the smooth functioning of the septic system and avoid costly errors down the line.

Designing a septic system involves various considerations, including site-specific factors, local regulations, and the specific needs of the property. A properly designed system not only saves costs but also simplifies the permitting and bidding process, ensuring that all design components meet the necessary requirements.

The Benefits of Comprehensive Design

A comprehensive design brings multiple benefits to the septic system installation process:

  • Cost Savings: By carefully planning and designing the system, you can avoid unnecessary expenses and potential rework. A well-designed system optimizes material usage and installation efficiency, reducing overall costs.
  • Streamlined Permitting Process: A detailed and comprehensive design ensures compliance with local regulations and requirements, making the permitting process smoother and faster.
  • Simplified Bidding: Clear and detailed design specifications make it easier for excavators to bid accurately and competitively for the installation project.
  • Efficient Material Selection: A comprehensive design enables you to select quality materials that are suitable for the specific system requirements, ensuring durability and longevity.

To achieve a comprehensive design, it is crucial to involve qualified professionals such as engineers, system designers, and knowledgeable contractors. They can provide expertise in system layout, sizing, and component selection, taking into account factors such as soil conditions, property size, and wastewater volume.

During the design phase, coordination with builders, poured wall contractors, and excavators is essential. This collaboration ensures a smooth installation process and minimizes potential conflicts or delays. It also allows for proper on-site marking of the system, ensuring precise installation and avoiding any disturbance to existing structures or utilities.

Design Approval and Permitting Process

Before proceeding with the construction of the septic system, the design must be reviewed and approved by the local health department to ensure compliance with their guidelines.

The design approval process typically involves submitting the design plans, including detailed drawings, specifications, and calculations, to the health department. Once approved, a permit is issued, granting permission to proceed with the installation.

It is important to note that the time required for design approval and permitting can vary depending on the jurisdiction and workload of the health department. Therefore, it is advisable to initiate the design approval process as early as possible to avoid unnecessary delays in the installation timeline.

Designing a septic system is a crucial step in the installation process. It ensures that all necessary components and considerations are taken into account, leading to a more efficient and effective system. By investing time and effort into comprehensive design, homeowners can have peace of mind knowing that their septic system will function reliably for years to come.

Step Four – Permitting and System Bids

Once the septic system design is approved, the next step is obtaining the septic permit from the health department. The timing of submitting the permit application may vary based on county policies. After the septic permit is issued, it is time to get quotes for the system installation. The design can be shared with three excavators of the homeowner’s choice, and bids can be solicited. It is important to have a detailed contract agreement with the chosen excavator regarding start and completion dates, payment terms, responsibility for damages, and installation schedule in case of adverse weather conditions.

By securing the necessary permits and establishing a clear contract, you can ensure a smooth and organized septic system installation process. Now that the design and permits are in place, it’s time to move forward with the installation.

Before we proceed to the installation, let’s take a closer look at the permitting process and the important considerations when obtaining system installation quotes.

Step Five – Septic System Installation and Inspection

Finally, the day of installation arrives. The excavator installs the septic system, and it is inspected by the health department before backfilling. The inspection includes checking for general requirements, gravity sewer connections, septic tank features, effluent sewer specifications, distribution box stability, trench header pipes, trench specifications, dosing tank installation, perimeter drain specifications, and mound system inspection.

Once the system is inspected and approved, the health department issues an approval ticket. The excavator covers up the system after payment, and the septic system installation is complete.

Inspection Checklist System Components Inspection
General requirements Septic tank features
Gravity sewer connections Effluent sewer specifications
Distribution box stability Trench header pipes
Trench specifications Dosing tank installation
Perimeter drain specifications Mound system inspection

Conclusion

Installing a septic system can be a complex process, but with the right guidance, homeowners can successfully complete the task themselves. This comprehensive septic system installation guide provides step-by-step instructions, tips, and requirements to ensure a successful DIY installation.

It is crucial to consult with local health departments to understand the specific regulations and requirements for septic system installation in your area. Additionally, involving a soil scientist can help assess soil properties and determine the minimum requirements for your septic system installation.

While it is possible to install a septic system on your own, it is recommended to seek advice from qualified professionals to ensure compliance and efficient installation. By following this guide and consulting with experts, homeowners can enjoy a fully functional septic system that meets their household wastewater treatment needs.

FAQ

What is the first step in installing a septic system?

The first step is to conduct an on-site evaluation, which includes a soil investigation conducted by a soil scientist, to determine the minimum requirements for the septic system installation.

Who issues the system requirements for the septic system installation?

The county health department issues the system requirements based on the soil investigation report.

What does the septic system design include?

The septic system design includes marking the system on-site, proper sizing of the effluent pump, and ensuring all system components are included.

When should I obtain the septic permit?

You should obtain the septic permit after the design is approved by the health department.

How can I get quotes for the system installation?

You can share the design with three excavators of your choice and solicit bids for the system installation.

What is involved in the septic system installation inspection?

The inspection includes checking various components such as gravity sewer connections, septic tank features, trench specifications, and dosing tank installation.

How should I ensure compliance and proper installation?

It is important to consult with local health departments, soil scientists, and qualified professionals for compliance and efficient installation.